Lake Zurich homes by the numbers
| Lake Zurich housing | Share |
|---|---|
| Built 1980 to 19891 | about 32 percent, 2,393 of 7,588 units |
| Built 1970 to 19791 | about 21 percent, 1,592 units |
| Built before 19801 | about 36 percent of homes |
| Single family detached2 | about 76 percent |
| Owner occupied2 | about 78 percent of occupied homes |
About 7 percent of the village's housing units are single family attached homes such as townhomes, and about 17 percent sit in buildings with five or more units.2
Doors on 1970s and 1980s Lake Zurich houses
A tune-up for a 1980s door is the service page for a door that still works but has gotten loud or jerky; the technician performs the balance check at the opening itself.
When the door is stuck in the tracks or sits crooked, stay out from under the opening and leave the car parked until a technician has had a look. Springs, cables and the release cord are the technician's to handle. A door stuck open after a storm is the service for a door that cannot be closed.
Checking a contractor in Lake Zurich
All contractors doing work in Lake Zurich are required to be registered,3 and a homeowner can verify a contractor's registration number and current information before any work is booked.
No permit application is approved without every contractor on the project being registered with the village.4 Registration runs by calendar year, and the contractor registration application asks for business contact information, proof of qualifications and a surety bond.
The Registered Contractors List4 is on the village website until each registration expires, and homeowners may call the Building and Zoning Department to see whether a contractor is registered. A homeowner looking at bids for garage door work can take that step before the first visit.
Lake Zurich permits
The list of common residential projects that need a building permit3 covers garages; driveway removal, replacement and expansion; electrical work such as new receptacles and switches; and windows and doors, new and replacement. The village says that list is not every project and asks homeowners to contact the Building and Zoning Division about anything not on it.
Neither garage doors nor openers appear on that list. The "Garages" entry is building a garage, and the "Windows & Doors" entry is new and replacement windows and doors. On a specific overhead door job, the Building and Zoning Division is where to direct the question.
An approved building permit is good for a full year,3 and Lake County's Planning, Building and Development Department conducts the inspections under an intergovernmental agreement. The county's inspector is the one at the door for a permitted job.
The village's code specifies that work done without a permit is against the law,3 and the village says it is becoming more common for prospective home buyers to ask the village for building permit and inspection records before making an offer.3
Building a new garage in Lake Zurich
For a brand new garage, the village has a checklist. All garage outlets shall be GFI protected except ceiling outlets for garage door openers and single dedicated outlets for appliances, and the plans are asked to give the overhead garage door header size, grade and species of lumber, with engineered headers.5 Wiring is for the garage's electrician and framing for its builder; a door for a new garage is on its own page.
The village's codes and driveway rules
Lake Zurich's residential codes include the 2018 International Residential Code, the 2017 National Electric Code and the 2024 International Energy Conservation Code, with the village's local amendments in Title 8 of its municipal code.6 What those code editions require of a specific overhead door job is a question for the Building and Zoning Division.
For a detached garage, the village's permit checklist says a detached garage may not exceed 720 square feet, that the plans must show how the siding or exterior will match the house, and that no garage may be used as a dwelling unit.5 Building a new detached garage is its own permit track.
For a driveway, the village says the driveway must keep a 3 foot side lot line setback and may be no wider than 20 feet at the public right of way and 24 feet at the back of the curb, and that an existing residential driveway wider than 20 feet at the right of way or closer than 3 feet to the side lot line may be kept, repaired and replaced as it is only if it complied when it was first installed.7 Driveway work has its own permit track.
The village's windows and doors permit handout says header details are required when an opening is enlarged or a new one created, all contractors must be registered with the village, and the inspection happens after installation but before trim or siding goes on.8 The handout covers windows and doors and does not name overhead garage doors.
What the village warns about after a storm
The village's Building Department warns that companies going door to door after a storm are many times unregistered, and advises never signing on the spot with a contractor who shows up to the door uninvited, getting at least three estimates on work to be done, checking the contractor's license, registration and insurance, and making sure everything verbally agreed to is in the written contract.9
A homeowner can check the names of companies bidding on the work against the Registered Contractors List before any visit.
